Construction Material Wholesale · Est. 2026

Materials at scale. Delivered on schedule.

Lumber, steel, concrete, drywall, roofing and finishes — stocked, staged and shipped out of South El Monte to job sites across Southern California and all fifty states. One purchase order. One delivery window. One number to call.

24 HRQuote turnaround
2,500+Stocked SKUs
50States served
Active construction site supplied by Global Depot Supply South El Monte, CA
What we do

Built for the way contractors actually buy.

We are a wholesale supply house, not a retail store. That means truckload pricing, cut-to-size service, and a delivery schedule built around your inspection dates — not around our showroom hours.

01
Wholesale supply

Full truckload and LTL quantities across eight core material categories, priced off mill and mill-direct contracts.

02
Jobsite delivery

Boom truck, flatbed and dry-van service with scheduled windows. Material placed where the crew needs it, not curbside.

03
Cut & fabrication

Cut-to-length lumber, rebar bending, sheet goods cut to your cut list. Precision work, no minimum run.

04
Takeoffs & estimating

Send drawings or a plan set and get a material takeoff with quantities, lead times and a firm number.

05
Trade accounts

Net-30 terms, dedicated account line, consolidated invoicing across multiple job sites and cost codes.

06
Custom sourcing

Specified a particular alloy, finish or imported stone? We chase it through our mill and import channels.

Core stock

Eight categories, always on the floor.

RefCategoryTypical specificationLead time
L-01 Dimensional Lumber Douglas fir & SPF, 2x4 through 2x12, #2 & better, kiln dried, graded In stock · 24 hr
L-02 Plywood & Sheathing CDX, OSB, T1-11, 4x8 and 4x9, APA rated, exterior glue In stock · 24 hr
S-01 Rebar & Mesh #3–#8 grade 60, cut and bent to schedule; welded wire mesh in rolls & sheets 3–5 days
S-02 Structural Steel Tube steel, angle, channel, plate — A36 and A500, cut to length 5–7 days
C-01 Concrete & CMU Ready-mix coordination, bagged mix, cinder block 8"/10"/12", mortar & grout 48 hr
D-01 Drywall & Framing 5/8" Type X, moisture-resistant, 25-gauge studs and track, corner bead In stock · 24 hr
R-01 Roofing Systems Composition shingle, TPO & modified bitumen, underlayment, flashing 3–5 days
F-01 Finishes & Hardware Tile, setting materials, fasteners, anchors, sealants, paints and coatings In stock · 48 hr

Open the full catalog →

How an order runs

Four steps. No guessing.

01
Send the list

Cut list, plan set, or a text message with quantities. We read everything the same day.

02
Get a firm number

Itemized pricing with freight and tax broken out. Usually inside 24 hours.

03
We stage it

Pulled, cut, banded and labeled by cost code so the crew is not sorting on site.

04
It lands

Scheduled delivery window with placement. Signed tickets back the same day.

By the numbers

Supply you can schedule around.

0+
Stocked SKUs
0hr
Quote turnaround
0%
On-time delivery
0states
Shipped to date
On site

Material moving where it needs to be.

Warehouse material staging Staging · South El Monte
Building material detail Bulk material
Construction materials on site Jobsite drop
Completed structure Delivered project
From the field

What the crews say.

I sent a cut list at 7am and had pricing by 10. Material was staged and on my job by Thursday. That is not normal in this market.

RM
R. Morales Morales Framing · Los Angeles

We run four sites at once. One account, one invoice per cost code, and they actually hit the delivery windows. That is the whole reason we switched.

DK
D. Kwon Kwon Build Group · Orange County

The rebar came bent to schedule and labeled by level. My guys did not have to sort anything. Saved us a full day.

JT
J. Tran Tran Concrete Works · San Gabriel Valley
Ready when you are

Send the list. Get the number.

Cut lists, plan sets, or a rough description in plain English. We read every request the same business day and come back with firm pricing.

Call Email Quote